Pharmaceutical warehouse Bucharest 

Our contribution consisted in finding optimal solutions for temperature and air quality control throughout the year, according to Health Ministery regulations. 

We used duct air-conditioning equipment, connected to a complex piping system and grilles that were intercalated and water heating batteries, as backup solution, along with dedicated automation, making it possible for each room cooling and heating irrespective of the outside temperature. 

This solution has generated very low operating costs, issue concluded by the Beneficiary in comparison with his other warehouses where classic cooling and heating solutions were used.